Bill continues to strip wires and nestle them in their electrical boxes while I spent the day making a place for the propane tank (which will be delivered and hooked up on Tuesday next) and digging a 12" deep ditch to the house from where the tank will sit.
Yesterday we made a trip to Wenatchee and Stoneway Electric to get the breakers we need to populate the electrical panel. Within a few days we'll be ready for the L&I electrical inspection, followed by the county building department inspection of plumbing and electrical, insulation installation, and then fireplace installation. Our house trim arrived at the lumber yard this week with siding soon to follow. A lot to do this last month of scrambling before the snow sends us home to Anacortes.
 |
| Prepping the location for the propane tank |
 |
| Retaining wall blocks "borrowed" from the retaining wall by the shop |
 |
| 12" x 16' ditch from the propane location to the house along the garage wall to the maintenance room, |