Tedious interior framing

 The last two days have been spent creating a barrier wall from ceiling to truss height where the 9-ft ceiling over the bedrooms meets the vaulted ceiling over the north wall of the living area to carry batted insulation. The engineered plans did not include this important detail. We consulted with the engineer who said we could build what we needed without "engineering" as the loads were negligible. The same situation exists on the opposite south wall of the living area though it will be less finicky. If all goes well today and we finish both walls, we'll be able to call for the framing inspection this week.