Over 90 degrees
It got hot by mid day yesterday but we had gotten the vapor barrier on the roof and hurricane clips nailed at the truss intersections with the walls so we withdrew to the RV for a respite. Gail stopped by to see our progress and was impressed. Porto-pot pump out happened, and, again it was at the three week mark.
No word from the garage door man when or if he will return to fix the two-times-broken part on the big garage door. Also waiting to hear back from the engineer regarding our proposed fix for the truss situation that doesn't provide for a insulation-able barrier between attic and vaulted ceiling. He initially okayed our plan as it's a non-bearing structure but he needs to tell us what beam dimension we need to use to span the two distances across the main room. The wall should be up before we call for the framing inspection.
![]() |