Inside walls started

 Because of changing the house floor level (after the garage was done) from the same level as the garage floor to a foot higher to give more crawl space access, the door openings to the maintenance and laundry rooms (which were framed in during the garage construction)  had to be frogged, i.e. ripped out and redone.  Not totally redone, but made a foot taller, so that's what Bill finished up today.  He also installed the doors and lock sets on those openings. That done, we got down to building interior walls for the maintenance/laundry room.  

Bill routing out the door opening to the maintenance room; laundry room door is to the left



End of day, doors installed with senior-friendly 5" steps😏

Interior walls and top-plating done for this area!